Solar division
480 megawatts of engineered sunlight, and counting
From a 40 kW warehouse roof to a 250 MW tracker farm — same modelling stack, same crews, same guarantee.

480MW
Capacity built
1.9M
Panels set
99.2%
Uptime
25 yr
Yield warranty
Programs
Four solar programs
Each one costed against your tariff, roof loading and grid connection date.
Rooftop C&I
40 kW – 5 MW
Ballasted or penetrating mounts engineered to your existing roof loading.
Carport & Canopy
100 kW – 12 MW
Structural canopies with integrated EV charging and lighting.
Utility Farm
10 MW – 250 MW
Single-axis trackers, bifacial modules, full interconnection management.
Agrivoltaics
2 MW – 60 MW
Elevated arrays that keep the land in production underneath.
Economics
What a typical 5 MW array returns
Illustrative figures for a Californian industrial rooftop at current tariffs.
7.1 GWh
Annual generation
$1.24M
Annual energy saving
4.6 yrs
Payback period
3,900 t
CO₂ avoided per year